Mixer Operator - Night Shift
High school-level Manufacturing / Production roles on Crosslinked list a median of $52k (535 that show pay). This posting does not list pay.
Mix adhesive batches and process waste adhesives and inks to keep coating operations supplied on night shift.
Weekly, free, one-click unsubscribe.
Worth knowing
Might not be for you. Physically demanding 12-hour night shifts with repetitive batching, lifting and waste handling
Adjacent materials role:Prepares adhesive batches, mixes adhesive components, processes waste adhesives and inks, and supplies coating operations
- Seniority
- Entry level
- Work
- On-site
- Type
- Full-time
- Degree
- High school
- Experience
- No minimum
- Industry
- Packaging
- Role
- Manufacturing / Production
- Schedule
- Night shift
Role details
Position Summary
The Adhesive Mixing and Waste Processing Operator safely prepares adhesive batches, processes waste adhesives and inks, and supplies coating operations with the correct materials. This position follows established Standard Work Practices, quality procedures, production schedules, and work instructions to prevent production delays and maintain safe, efficient operations. Shifts: Nights-6PM-6AM based on a 2-2-3 schedule (overtime as needed based on business needs) Mix adhesive components in a safe, effective manner. Treat and process waste adhesives and inks. Where applicable, adhere to the defined Standard Work Practices.
Mix adhesive per coating schedule to ensure that coaters do not go down waiting on adhesive. Ensure that all materials and supplies are correct for product being produced per CSI and/or work instructions. Knowledge: Must know and understand quality procedures, standard operating procedures, proper setups, basic math, and productivity requirements. Must know and understand the computer operating procedures for production reporting.2.
Experience
Maximum time to perform satisfactorily in the job is 90 days. High School diploma or equivalent Batch adhesives averaging about 30 to 48 drums per shift. Push force of 20-30 pounds required Weigh out catalyst, defamer, water, and other additives 30 to 48 cycles per shift. <10# lifting req [Load ink distiller with waste ink once per shift. 20 to 40 pounds lifting required Load clean water tank with chlorine 1-2 times per shift. 25 pounds of lift required. Load lime into waste processing building 1 time per shift. 40 pounds lifting required Push trash tote outside. Push force between 30 to 120 pounds required Load ADS with adhesive components 1 to 6 times per shift.
Forklift Assisted Pump waste adhesive to waste treatment building 5 to 15 cycles per shift Job functions may change over time and may include other duties as assigned by management. #PPF1
Related roles
- Production Operator ITekniPlex · Winston Salem, NC
- Technician I – ProductionBAE Systems · Westminster, CO
- Manufacturing Engineering Intern - Summer/Fall 2027Henkel · Mentor, OH
- Process Technician Apprentice- Chattanooga, TNBASF · Chattanooga, TN $37k – $52k
- Composite TechnicianGeneral Atomics Aeronautical Systems · Spanish Fork, UT



